Forum Home
Press F1
 
Thread ID: 70916 2006-07-20 23:12:00 Full capacity translates into six-month wait for broadband Trev (427) Press F1
Post ID Timestamp Content User
472462 2006-07-20 23:12:00 Click Here (www.nzherald.co.nz)

Trevor :)
Trev (427)
472463 2006-07-20 23:25:00 Telecom said it had 2984 cabinets, of which 42 boxes were running at full capacity.

Whats that ... about 1.5% capacity, just how long does it take to upgrade 42 boxes out of 2984?
netchicken (4843)
472464 2006-07-21 03:15:00 What is just as bad is the fact that local boxes have Conklins to connect your copper wire back to the main exchange.

These have a backhaul limit of 2.0mbps. This means that you will NEVER get better download speeds than this and that ADSL2+ will NEVER be available to you.
Rob (6897)
1