| Forum Home | ||||
| Press F1 | ||||
| Thread ID: 70916 | 2006-07-20 23:12:00 | Full capacity translates into six-month wait for broadband | Trev (427) | Press F1 |
| Post ID | Timestamp | Content | User | ||
| 472462 | 2006-07-20 23:12:00 | Click Here (www.nzherald.co.nz) Trevor :) |
Trev (427) | ||
| 472463 | 2006-07-20 23:25:00 | Telecom said it had 2984 cabinets, of which 42 boxes were running at full capacity. Whats that ... about 1.5% capacity, just how long does it take to upgrade 42 boxes out of 2984? |
netchicken (4843) | ||
| 472464 | 2006-07-21 03:15:00 | What is just as bad is the fact that local boxes have Conklins to connect your copper wire back to the main exchange. These have a backhaul limit of 2.0mbps. This means that you will NEVER get better download speeds than this and that ADSL2+ will NEVER be available to you. |
Rob (6897) | ||
| 1 | |||||