| 2420 | 1999-07-12 03:20:00 | I have installed MS Project on my networked PC at work and have noticed the calender drop down menus (used in start/finish date column) do not go beyond Dec 1999. The only way I can enter Y2K date is manually. However I DO NOT have the same problem with the drop down calenders in Outlook. I have installed the same software on my PC at home with no such problem, so I suspect the PC. Where do I look to solve the problem or shall I re-install the software? |