| Forum Home | ||||
| PC World Chat | ||||
| Thread ID: 126583 | 2012-09-06 01:36:00 | Attention all you Handwringers and Procrastinators in Christchurch. | B.M. (505) | PC World Chat |
| Post ID | Timestamp | Content | User | ||
| 1299248 | 2012-09-06 01:36:00 | THIS (www.youtube.com) is how its done. | B.M. (505) | ||
| 1299249 | 2012-09-06 01:42:00 | With CERA and Brownlee ... absolutely no chance. | SP8's (9836) | ||
| 1299250 | 2012-09-06 04:38:00 | Opps, someone forgot to get the crane off the roof :) They WORK 7 days a week 24 hours a day over there, here they might work nearly 8 hours a day, 5 days a week if you're lucky to stretch it out as long as possible. But yeah, thats how it done alright :thumbs: Good find B.M. most intersting. Thanks. |
Iantech (16386) | ||
| 1299251 | 2012-09-06 04:48:00 | Plus the prep work was probably 10 years in fabrication LOL Still cool BM |
Gobe1 (6290) | ||
| 1299252 | 2012-09-06 05:05:00 | Designed by Alan Reay Consultants... | John H (8) | ||
| 1299253 | 2012-09-06 06:02:00 | Plus the prep work was probably 10 years in fabrication LOL Still cool BM Theyd have the Prep Work and Fabrication done before we got Resource Consent! ;) |
B.M. (505) | ||
| 1299254 | 2012-09-06 06:04:00 | We have found the quick way to get a house repaired. Get the lady of the house to keep ringing FletchersEQR for a "Scope Report", she asked three times and we had three meetings but no Scope Report forthcoming. Third meeting result ! you are out of your house for repairs to start in 8 weeks and back in within 6 to 8 weeks. Out on the 19 July and back in on 1 September. Lurking. |
Lurking (218) | ||
| 1 | |||||